Whitemoss Hazardous Waste Landfill

Service Area: Waste Facility Management
Location: Lancashire
Date: 1998 - Present

Wardell Armstrong have worked on the Whitemoss Landfill site on behalf of our Client for over 20 years, being involved in the design and engineering of the landfill. This includes preparing construction quality assurance (CQA) plans for approval by the Environment Agency (EA), supervising work and providing validation documents to enable the site to accept hazardous waste materials. The CQA plans include stability risk assessments, detailed design and methodology for construction which once approved by the EA enable the site to be constructed under the supervision of an independent CQA Engineer who then validates the works.