East Anglia ONE North and East Anglia TWO Onshore Cable Route

Service Area: Desk Study, Infrastructure Design, Site Investigation
Location: Suffolk
Date: 2016 - Present

Wardell Armstrong are working with Scottish Power Renewables (as a sub-contractor to Haskoning DHV) on the landfall and onshore cable route selection for two offshore wind farm projects in the east of England, providing ground and civil engineering support through to the submission of the DCO applications.

This includes outline design of the landfall (requiring Horizontal Directional Drilling), cable routes, obstacle crossings (including HDD / trenchless), substation platforms, drainage, and permanent and temporary access roads. This has required consideration of the likely ground and groundwater conditions. Estimations of the construction programming and vehicle movements associated with construction are also being developed. Wardell Armstrong have continually responded positively to project changes as the project has developed to support the wider project team.

Project

Find Sectors and Services

Use the options below to help you navigate quickly and easily to your desired section of our website.

Find a Team

Use the options below to help you find the team you need.

Find an Individual

Use the options below to help you find the specialist you need.